Showing posts with label ICC. Show all posts
Showing posts with label ICC. Show all posts

Thursday, October 18, 2007

Rescuing Box Turtles from Maryland’s Planned ICC Highway (part 3)




As promised more on the turtles!

Major construction is supposed to start in October-November 2007.

The Humane Society and the Box Turtle Advisory Commission are now seeking out turtles. They are marking and inventoring the turtles. Later these turtles will be outfitted with a transmitter, when the groups receive them. However, worries for the turtles abound.

For one, there may not be enough transmitters. Some of the transmitters are too large for the baby turtles. Once construction begins, the groups will have to search and dig for the turtles. Disrupting a turtle during hibernation is not helpful for the turtles. Plus no one have moved 150 turtles at one time. Also since not all of the turtles have been found, construction workers are trained to pick up the turtles and call the environmentalists.

It does not bode well for the turtles. Meanwhile, the lawsuits concerning the ICC are still pending in the courts. However, notice has been received that construction will start - date unknown.

Find out more about the ICC:

WikiPedia: ICC
http://en.wikipedia.org/wiki/Intercounty_Connector

Toll Road News
http://www.tollroadsnews.com/

Monday, October 08, 2007

Rescuing Box Turtles from Maryland’s Planned ICC Highway (part 2)

What is the ICC Highway?

This 18 mile highway would run north of the Capital Beltway (Washington D.C.) aka 495, connecting Interstate 270 with Interstate 95 in Laurel MD. This highway has been debated for years now to help the traffic flow in Maryland. One problem, it goes through prime turtle territory as well as other animals. This road is to be a six lane toll road.

My Opinion

The problem with building more roads is that they increase the traffic. Instead of roads, mass transit is needed. However, in this area (VA-DC-MD), people prefer driving to using the bus or subway. Sigh, we have the worst air pollution outside of L.A. Instead ozone actions days, we go one step higher - Code Purple.

The Turtles?

This highway costs $2.4 billion. They have only allocated $20,000 to finding the turtles and putting transmitters on them. The transmitter will allow for turtle evacuation when the highway construction starts. However, the time is limited and will probably occur when the turtles are hibernating.